Wednesday, December 29, 2010

Again on square feet cost-Query and reply

QUOTE

Let me be frank in saying that I am planning to construct only a single floored house with about 1000 to 1500 sq ft area.  It would be grateful if you could tell me the estimation also.  I know it cannot be fixed, but at least I will have an idea of the amount.  As I have no experience in these rates and especially the rates in Kerala, as I was born and brought up in Hyderabad.
 
Hope you would do the needful.

Smitha

My reply

Without any data,without using Engineering Estimate methods,a professional like me is not supposed to give any guess estimate.It is against professional ethics to misguide a client using a non professional baseless term called square feet cost
Even the plinth area of house indicated by you is just a guess.Only after preparing a plan of the house by a professional,you will know even that figure
House construction is not that simple as going and buying rice from market.It involves hundreds of materials and lot of skilled labour.

With professional guidance you can get best value for your money with maximum utility for the house and a professional if engaged through out construction will guide you on how to  reduce cost ,if that is your concern.
 
I have directly built more than 200 houses in Kerala.When completed all these houses had different square feet cost and hence I do not know on what basis such a term is used.
If you tell me how many rooms and other facilities you need in the house,location of place where house has to come I can possibly give a guess
But the golden rule in house construction is simply this:
Do not wait for entire money expected for house construction to reach you.Cost of construction increases at least by 20% every three months.If you do not start construction immediately,you may not even be able to reach your dream house tomorrow.Tomorrow will be too late.

Tuesday, December 28, 2010

Commencement of construction of house-Query and reply

QUOTE

I am searching for an Engineering firm to help me with plan preparation for home in Vaikom. I need flexibility from the firm in incorporating our ideas. We have some pictures that we have picked up from design magazines that we want to use to guide the design. I am non resident (US) so I need the process of plan iterations and discussions done through email/phone. Also I have my parents living next to the plot to oversee construction so I may not need your help with supervision/ construction itself. Please let me know if that is OK. 

My reply

A house is designed by any qualified and experienced Architect after studying the following
1.Plot and surroundings
2.Vasthu aspects of the plot if the Architect is conversant with Vasthu
3.Modern architectural and structural engineering concepts.
4.Relevant building rules of the location
5.Your budget limitations if any
Elevation of any other house may not exactly suit your house as elevation depends to a great extent on the plan of the house.Only after finalising the plan,Elevation can be considered.It may be possible for the Architect to understand your elevational hopes if you show him some of the elevation you liked.But you have to understand that elevation is dependent on plan of the house which will have to be discussed and finalised at first.


Having your relatives at site may help you in  coordinating with the work.But your relative cannot substitute an experienced building professional as building construction require design details and instructions from a professional at every stage of construction.Plan and Elevation are only starting drawings for construction.More detailed drawings,engineering details are required for proper implementation of work at every stage and steps of construction.


You also need skilled workers who follow best construction practices and drawings of a professional correctly to get work done well.In interior locations,one worker and his co workers do entire works related to construction.But a professional agency use workers with expertise for each type of works and it will give you better quality of work.

Saturday, December 25, 2010

Cost of construction-another query

QUERY

How much did it cost to build that home in Irinjalakuda?
Anuj

 

My Reply

There is no point in asking how much it cost for some one to build a house.
In house construction we use hundreds of materials and hundreds of skilled labour for various type of works
Cost of all these keep raising day by day
Once you decide to construct a house do it fast.Do not wait till it become impossible  for you to manage funds
Of course qualified and experienced professional guidance can ensure better value for money spent and lesser cost due to proper guidance

Thursday, December 23, 2010

Cost of house-Query and reply

QUOTE

I just came across your site.
 
Could you  please give me the  approximate cost for a 2800 S.feet house with reasonably good finishing including all charges.
to build the same for my cousin in Trichur.
 
Sree Jayan

My reply

Look. It  looks like very easy to find out cost of constructing a house.On your own you assume square feet plinth area of the house without even preparing a plan and then like going and finding cost of a Kg of onion from the shop, an Architect is expected to tell you square feet plinth area of constructing a house which cannot be done in a day or week or month.

Construction of house require at least an year.During this period of construction cost of hundreds of different material used for construction normally goes up in Kerala conditions.Some times it is not even available

For example take the case of few materials.
Rubble used for foundation work cannot be taken that easily.There are so many restrictions,too many licenses,too many government officials to be bribed to take rubble and transport it to site.

River sand simply cannot be taken or transported.But still transporters try to supply it with the hope of extracting money as they demand from the builder.So they bribe as required to ever willing bribe takers who consider government job as a license to take bribes

Almost all materials are to be transported to site.Even after taxing more than 100%,government  has no hesitation in increasing price of petroleum products and never bothering to reduce cost even if international price of crude oil reduces.Cost of diesel is now more than when international prices were double.Both state and central government consider petroleum products as cash cows.

With each increase in petroleum products, price of every material goes up.During one year period of construction of house,nobody knows how many times price of diesel will go up.

Transporting  river sand is like smuggling activity.So many have to be bribed.Transporter naturally would like higher profit for transporting such a risky material.

Getting good workers regularly for construction work is a big challenge.So if you need workers you have to pay them what they demand even if they are not very good quality workers.Here demand is more and supply is less.

Even with all these you want the contractor (trying to make money by building your house) to commit a firm square feet cost of construction ,that too lesser than what others may quote if he want  your work.

He is not educated or articulate  enough like me to explain the meaningless nature of your so called “square feet rate”.So to get work from you he  will quote lower square feet rate and you  will be only happy to learn or even dream about his possible loss by taking up your construction work!

I have seen several times happiness on the face of my clients whenever material and other input cost goes up just by imagining  his saving of money by obtaining a “square feet rate” from contractor.Like most of Malayalees you will also be happy to think about losses your contractor will make by doing your work.

But if you think that you are smart and your contractor is a fool,you are mistaken.

With varying cost of all inputs of construction like material and labour,he will have to compromise on quality of construction to make profit.He will make you believe that all improper construction practices followed by him are the right way of doing the construction and you do not know what is right and wrong in construction .So you believe him.
Even after doing all quality compromises if he is still not able to make profit,he will ask for rate revision or extra charges when he is sure that no other contractor will come and take up half work done by him
So he will get profit  some how or other by doing your work as he has seen many like you trying to be smarter than him.
Finally when the work near completion with all quality problems which may not be noticeable immediately,contractor will find ways of extracting extras from you and you desperately trying to complete house construction some how.At that point of time “square feet cost” is forgotten by you and by the contractor also.

Square feet cost of construction is simply a lie house builder will have to tell you to get work from you

You should not expect a qualified and experienced house building professional to go to such lower levels of an illiterate contractor (with only one interest-make profit  by hook or crook) to give you such baseless “square feet cost”

Wednesday, December 22, 2010

Modification of existing home

QUOTE

I am from near to Tripunithura, Ernakulum. I want to reconstruct my present home which is 40 Yrs. old [ Present Roof is  Tiles ] .
I request your kind advise in this regard, which is at low cost.
 
Unnikrishnan.

My reply

Existing house to be modified will have to be studied in detail by me before I can comment on what can be done to modify the existing building.

Every professional with qualifications and experience in the field will try to reduce your construction cost by design and by technical guidance during construction.A professional Architect is supposed to give you better design with better facilities and at lower cost.

If you tell him clearly about your true budget limitations,he will advise you how to go about the work to limit your cost.On many occasions I have found that client  do not tell about actual financial conditions or fund available and fund that can be obtained from external sources.

Most clients think that if they tell Architect about lesser fund availability,he will have some magic wand to reduce cost.With lesser fund availability if true,you should be willing to restrict facilities you seek in the house  and also willing to accept suggestions of the Architect to reduce cost

Monday, December 20, 2010

Is a plan enough for building house?

From the mails I receive I get a feeling that lot of people have too many wrong ideas about plan of house.Most important wrong ideas are the following

1.Any plan prepared by any one or taken from any website is good enough for plan of your house

2.There is no meaning in paying a higher fees or charges for getting plan of the house prepared by a well known Architect

3.If the plan of the house is ready, builder of the house can manage everything else.No more need for a professional Architect/Engineer.

4.An Architect can make good elevation of the house for any plan

5.If a picture of the house taken from anywhere is given to an Architect,he can make a similar or same Elevation whatever may be plan of your house.

All these are wrong.

A qualified and experienced Architect will have to discuss in detail with you to understand what exactly you need in the house to be designed and built.

He has to see the land where the building has to come up.By seeing the land,he will visualise your house in the plot,check nature of land,surroundings,level of land,Vasthu aspects if he is good at Vasthu also.He will also check up whether there is any restraining factors for building a house as per Kerala Building rules.

While preparing plan for your house knowledge of Architect and his rich experience is used to design the house to get following:

1.Better facilities for you as per your wishes but with lesser cost

2.Better utilisation of every built up space.No unnecessary or unwanted space in the house.

3.Better features of modern architecture and Kerala Architecture if he is well versed with Kerala Architecture.

4.Vasthu compliance for each portion of the house(If he is good at Vasthu)

5.Better structural design to reduce cost

6.Better appearance for the house

For getting all these benefits is it not worth paying few thousands to an Architect?

Even after preparation of plan and Elevation,there are several architectural and structural engineering drawings required for proper and correct implementation of construction of house.Even the drawings prepared by an Architect as plan and Elevation has to be explained with details for the builder to know how to proceed with construction.

So your need for professional assistance and guidance does not end with preparation of plan.Plan will have to be designed in a manner to obtain a good Elevation.You cannot have any Elevation for any plan.Plan and Elevation are inter related.

When I was finalising plan of the house,one of my client told me that a particular builder can do the construction just by getting plan of the house.Then I told my client that he should not engage that builder if he says like that.He does not even know about need for detailed architecture and structural Engineering drawings and periodic on site supervision by the designer.

Only when the construction started and drawings after drawings on details started coming,my client understood importance of having professional guidance during construction.

And now the money part.For the payment an Architect takes , you save much more in lakhs during construction using his guidance and you finally get a better quality construction at lesser cost with proper utilisation of every built up space with definitely more value for money spent by you.

Do not think that Architects and Engineers are costly.They bring their rich experience,knowledge to make a better house for you and in the process in spite of paying them fees,they reduce cost of constructing your house substantially and guide you to have best and latest facilities and trends for your once in a life time dream house.

Do you want to save those fees given to professional and lose both money and better house by design and construction?

Friday, December 17, 2010

Flooring-new trends

Flooring options change often as new materials and trends coming in thereby completely or partially removing from the scene flooring materials which were in use for a long time.

About ten years back,mosaic and mosaic tile flooring were in use.Now you do not see such flooring anywhere.Before that red oxide flooring was very common.Now it is difficult even to find good masons who knows how to lay red oxide flooring well.Plane cement plastering was also used for flooring.

Clay tile flooring

If you look at old palaces,clay tile flooring was quite common.But the quality of clay tile used were not good resulting in wear and tear of the clay tile surface.So,when  I talk of going back to clay tile flooring first question I get is that will it last.

Present day clay tiles are better in quality.It will not  get damaged due to constant movements of men and material on clay tile laid surface.On slope roof,you have to lay clay tiles to give it that old Kerala traditional house appearance.Unlike in the olden days clay tiles laid on slope roof will not get fungus on it as it will be painted with new anti fungal paint which will give natural clay colour for the tiles.There are special tile shield paints which protect the clay tile from effects of sun and rain at least for about 5 years and after this you will have to re paint it.

On flat roof surface old method of plastering exposed surface is not that good.With sun and rain lashing the flat roof surface,it will get a big coat of fungus and gradually plastered surface will whither away thus causing wetness damaging concrete surface gradually and if the concrete laying was not done properly(That is the usual case with workers trying to do an easy job and contractor trying to reduce costly material content to increase profit and “very clever”owner of the house who tried to save fees payable to professional engineers or a professional agency giving house construction work to that “square feet cost”contractor.In almost all cases owner of the house simply believes lies told by contractor to hide his improper methods of concrete laying, as he himself does not know much about proper laying of concrete)

Instead of plastering the exposed surface of flat roof concrete,if you lay clay tiles it will act as permanent protection against rain and sun for concreted surface.Clay tile laid will reduce a good portion of heat being passed on to concrete roof as it absorbs heat.This will result in better cooling inside house.Of course clay tile can also cause fungus formation on top of it.But if you polish the exposed  clay tile surface after laying and apply anti fungal polyurethane coating,it will not attract fungus growth and clay tile will remain in tact braving sun and rain.On exposed roof surface you can also apply anti fungal  tile shield paint.But it will not look that good .

Inside bed rooms you can go for clay tiles as it will be more environment  eco friendly and definitely more healthier for you to move around or even sleep over bare floor .All other flooring materials except of course wooden flooring will not be eco friendly.

Wooden flooring

With cost of granite slabs going around Rs.200/-,using teak wood flooring will not be comparatively costly.There are agencies who will take up complete teak wood or other wood flooring on turn key basis including polishing using imported polishing material which will make the floor last for years without any damage.Of course you should not pour water over wooden floor surface or wash the floor with wet cloth.It will damage polishing.You can definitely use wooden flooring in areas where traffic is less like office room,bed rooms etc.

Other tiles

Granite and marble is on the way out of flooring.At least that is the present day trends .Marble is practically gone out and granite will move out shortly.Developments in technology has brought in materials like Naturoc tiles of NITCO and similar tiles from other manufacturers.These are available in thicker thickness thereby making it easy for bending edges like in granite.There are varieties of tiles which has got both anti stain mirror finish and rough surface.With rough surface tiles that can be bend at edges,these tiles make ideal choice for stair steps in place of granite slabs used earlier.

Tiles of various design and colour combinations now available and your Architect can custom design your toilet walls and floors using design specifically developed for you.

Outside wall tiles

Your compound walls and outside exposed walls can be given special exterior wall tiles with new design combinations.Similarly good design interlock tiles are available for laying  in the compound and car porch